Clarify ownership, acceptance evidence, and service boundaries before a cabinet reaches the floor.

Pre-Deployment Review

  • Floor load, aisle, and cabinet footprint check
  • Dedicated circuit and network responsibility matrix
  • Jurisdiction-specific evidence register

Post-Go-Live Operations

  • Alert triage and remote-diagnostic permissions
  • Preventive maintenance and parts stocking plan
  • Firmware staging, validation, and rollback records

Eight Questions to Close Before Commissioning

The answer depends on jurisdiction, game configuration, software version, payment path, and operator license. GLI-19 evidence may support review but does not replace local authorization.

Wi-Fi may suit noncritical services, but payment, monitoring, and configuration traffic should follow the operator security architecture and tested failure-mode plan.

Power faults, damaged harnesses, failed validators, display damage, and locked regulatory components may require trained on-site service and authorized parts.

Uncontrolled Change vs. Managed Release

Uncontrolled

Unrecorded firmware, mixed cabinet states, unclear rollback ownership, and acceptance evidence assembled after an incident.

Managed

Signed release package, staged sample, recorded software hash, operator sign-off, and an approved rollback window.